Structure Strengthening Work

Location: – Azerbaijan
Client Name: – Baku Metro
Year of Construction: November 2015

Problem: – In order to stop further damage by severe corrosion to the metal underground structure of the Metro in Baku, a first test project was set up during first week April 2014.

Solution: – Universal Multi-Performance Coating (UMC) was applied in 2 layers at average of 250µ DFT on the test patch. Evaluation was made after full curing adhesion and scratch tests. The Metro responsible engineers were pleased with the highly satisfactory results.

End of June 2014, decision was made by the Chairman from the Baku Metro, after meeting and discussions to continue further applications in the Metro. Contract was concluded to start this encapsulation project with purchase of three 20 foot containers Universal High Performance Coating (2660 gallon each). We started organizing the purchase of all the necessary materials and equipment in order to carry out this work properly and in safe conditions. In September 2014 the first 20 foot container with 2660 gallon Universal Multi-Performance Coating (UMC) arrived in Baku.

Read Prashant Kabra’s Popular New Book

Contractor’s Guide to Site Solutions: A Sip-by-Sip Guide to Product Selection 

Very helpful insights. This book has become a key resource for my team and me.
S.K. Tiwari
Railways, Engineering Department
This book breaks down complex topics so clearly that anyone can understand them, even if they are not an engineer.
Rahul Garai
Director, Carry Construction West Bangal
Outstanding content that combines solid engineering with practical experience.
S.K. Yadav
Sr. DEN Coordination, Eastern Railways Howrah
Indias leading Geosynthetics solution provider company

4 Antara Tower, 94, Temple Rd, behind Gupta Tower ,
Civil Lines, Nagpur, Maharashtra 440001

91 7391 000106

sanbros@ssplngp.com

+91 7391000106
sanbros@ssplngp.com

Get Social